Interlogix Concord Express Installation Manual Manual de usuario Pagina 30

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 117
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 29
Chapter 1
24 Concord Express Installation Instructions
Figure 18: Connecting the power transformer
Powering Up the Panel
Note: Without AC power, shutdown will occur if battery voltage falls below 10.2
VDC.
After installing SnapCards and wiring all devices to the panel, you are ready to
apply AC and backup battery power to the panel.
To power up the panel:
1. Connect the red and black battery leads (included with panel) to the lugs
located in the upper-left area of the panel circuit board (see Figure 19 below).
Figure 19: Connecting the backup battery
2. Connect the battery leads to the battery terminals as shown.
3. Plug the transformer into an outlet that is not controlled by a switch or ground
fault circuit interrupt (GFCI).
Vista de pagina 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 116 117

Comentarios a estos manuales

Sin comentarios